Company news

Company staff, R&D and production equipment moved to a new address

2025-01-09
In December 2024, the company completed the relocation of all personnel, R&D and production equipment. The actual use area of the new office production site is more than 7,000 square meters, which ...

The company has completed the construction of the measuring room

2025-01-09
In December 2024, with the arrival of the German Mahr ULM300-E universal length measuring instrument with 0.09um accuracy, the full range of measuring equipment for the production of high-precision...

The company completed the PPAP production of direct drive proportional solenoid valve for automatic transmission

2025-01-09
On December 30, 2024, the company completed the PPAP trial production of DCT transmission direct drive solenoid valve. The solenoid valve produced in this batch is a proportional pressure solenoid ...